What was found
(SUPPORT TASK) AFT CARGO COMPARTMENT FRAME AT STA 1460, S-26L HA S A DENT.() AFTER REPAIR INSTALL OR 50,000 AIRFRAME FLT CYCLES, WHICHEVER AND DETAILED INSP WITH AN INTERVAL OF 12000 FLT CYCLES COMES FIRST. DETAILED INSP & HFEC REQUIRED PER B757 SRM 53-00-07-2R-5 REPAIR 5 TABLE II ZONE 1 INITIATE A AFTER 37,500 FLT CYCLES AFTER REPAIR INSTALLATION OR 50,000 DIP TO ACCOMPLISH A DETAILED INSPECTION AFTER 37,500 FLT CYCLES AIRFRAME FLT CYCLES WHICHEVER COMES FIRST ACCOMPLISH HFEC INSP INSPECTIONS AFTER 37,500 FLT CYCLES AFTER REPAIR INSTALLATION OR TOMC-APPROVAL FROM SC1ELBYC COMMENT 50,000 AIRFRAME FLT CYCLES WHICHEVER COMES FIRST ACCOMPLISH HFEC INSP AND DETAILED INSP WITH AN INTERVAL OF 12000 FLT CYCLES PER SRM 53-00-07-2R-5 DIP 53-DIP FOR UPDATE RII INSPECTION ACP ON N/R 59307 BY INSP STAMP #131 AT ST PNS. REPAIRED AFT CARGO COMPARTMENT FRAME AT STA 1460 IAW SRM 53-00-0 7*2R-5 REPAIR 5 DETAIL 3. EMP# V940976 WORK ACCOMPLISHED AT ST E NGINEERING OF PNS RECORDS UPDATE -- DC REVIEWED REVIEWED QC REVIEWED QC REVIEWED INIT : 50000 TAFC (INIT WILL ITO TO RIR) RIR : 12000 FC -- DCU391596