What was found
EA 5310-07582 REV A: AFT CARGO COMPARTMENT STA 1300 R/H S26-S27 HAS AN EXISTING REPAIR WITHOUT SRM STANDARDS. PER ECRA 5360-01712 PART 1.2. IT STATES TO CREATE A DIP TO READ: 5360-01712 ON OR BEFORE 26 MAY 2024. EXISTING REPAIR WAS FOUND PERFORM AN INSPECTION PER PART 2 OF THE LATEST REVISION OF ECRA WHILE WORKING ECRA 5310-07582 OP 002 (AD 2020-05-25) AFT PIT STA 1300 FRAME INTERIM REPAIR WAS ACCOMPLISHED AT ST PNS DURING 1C VISIT ON ST PNS HGR NR 62334 AND PER ECRA 5360-01712. ECRA 5360-001712 PART 1 INTERIM REPAIR WAS COMPLETED PER VT MAE TOMC-APPROVAL FROM SC1ELBYC COMMENT 757-5360-13-A3222, REF STP NS HGR NR 62334. OK TO PLACE DIP FOR STEP 2 PERFORM AN INSPECTION PER PART 2 OF THE LATEST REVISION OF ECRA 5360-01712 ON OR BEFORE 26-MAY-2024. REVIEWED QC REVIEWED INSPECTIONS CREATED BY AUTODIP PENDING AIRRAFT RECORDS AUDIT & UPDATE.