Service difficulty report · Window Frame · Boeing 737924ER

Difficulty date
June 29, 2023
Submitted
June 30, 2023
Operation
Air carrier
Aircraft
N37413
Make and model
Boeing 737924ER
Aircraft serial
31664
Aircraft time
45,712 hours, 16,118 cycles
Part
Window Frame
Part number
654A0004774
Condition
Corroded
Location
Fo Side
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLIGHT DECK FIRST OFFICER FIXED SIDE WINDOW HAS CORROSION ON FWD SIDE OF EXTERIOR FRAME REF. AAR N/R: 9488632 OF 18,037 TOTAL AIRCRAFT CYCLES, PERFORM A PERMANENT REPAIR PER PART 3 OF THE LATEST REVISION OF EC/RA#5610-01457 REF. AAR N/R: 9488632 WORK ACCOMPLISHED BY: V914216 INSPECTED BY: V898771 ON OR BEFORE THE ACCUMULATION OF 18,037 TOTAL AIRCRAFT FLIGHT CYCLES, PERFORM A PERMANENT REPAIR PER PART 3 OF THE LATEST OF ECRA 5610-01457. ACCOMPLISHED INTERIM REPAIR FUSELAGE RHS NO.3 WINDOW FRAME E-F TOMC-APPROVAL FROM SC1ELBYC COMMENT POST INTERIM REPAIR.UPON THE ACCUMULATION OF 16,037 TOTAL AIRCRA FT CYCLES. PLANNING TO CONTACT ENGINEERING FOR THE PERMANENT REPAIR REQUIREMENTS FOR PART 3 OF THE LATEST REVISIONOF THE THE LATEST OF EC/RA 5610-01457 .ON OR BEFORE THE ACCUMULATIONOF 18,037 TOTAL AIRCRAFT CYCLES, PERFORM A PERMANENT REPAIR PER PART 3 OF THE LATEST REV. ACCOMPLISHED INTERIM REPAIR FUSELAGE RHS NO.3 WINDOW FRAME E-F ON OR BEFORE THE ACCUMULATION OF 18,037 TOTAL AIRCRAFT FLIGHT TOMC APPROVED : QC REVIEWED POST INTERIM REPAIR.UPON THE ACCUMULATION OF 16,037 TOTAL AIRCRA FLIGHT CYCLES, PERFORM A PERMANENT REPAIR PER PART 3 OF THE FT CYCLES. PLANNING TO CONTACT ENGINEERING FOR THE PERMANENT LATEST REVISION OF ECRA 5610-01457.REF L/P 6690032 REPAIR REQUIREMENTS FOR PART 3 OF THE LATEST REVISIONOF THE THE LATEST OF EC/RA 5610-01457 .ON OR BEFORE THE ACCUMULATION ADD EMP:V917216 RECORDS UPDATE RECORDS UPDATE TOMCQC REV PERFORMED REMOVED AND REPLACED RIGHT-HAND NO. 3 WINDOW