Service difficulty report · Skin · Boeing 7879

Difficulty date
September 11, 2023
Submitted
September 18, 2023
Operation
Air carrier
Aircraft
N29984
Make and model
Boeing 7879
Aircraft serial
66143
Aircraft time
14,233 hours, 1,477 cycles
Part
Skin
Part number
UNKNOWN
Part serial
NA
Condition
None
Location
Fuselage/Wings
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LIGHTNING STRIKE LIGHTNING STRIKE INSPECTION REQUIREMENTS DMC-B787-A-05-51-19-00A-311A-A CREATING DIP TO RECHECK DAMAGE TOMC APPROVED TOMC-APPROVAL FROM SC1ELBYC COMMENT INSPECTIONS CREATED BY AUTODIP PENDING AIRCRAFT RECORDS AUDIT & UPDATE. REF LOGPAGES 5727363 AND 5727382 CREATED FOR PHASE 2 INSPECTION. PHASE 1A AND 1B LIGHTNING STRIKE VISUAL INSPECTION CARRIED OUT AS PER DMC-B787-A-05-51-19-00A-311A-A. PHASE 1A AND 1B LIGHTNING STRIKE INSP ACCOMPLISHED. PHASE II INSPECTION MUST BE COMPLETED WITHIN 15 FLIGHT CYCLES FOR THE HORIZONTAL STABILIZER AND ELEVATOR. TOMC APPROVED : QC REVIEWED. RECORDS UPDATE OK TO CARRY THE PHASE 2 INSPECTION FOR THE HORIZONTAL STABILIZER AND ELEVATOR WITHIN 15 FLT CYCLES PER AMM 05-51-19. CARRIED DIRECTLY BY TOMC TOMC-APPROVAL FROM SC1ELBYC COMMENT TOMC APPROVED : QC REVIEWED. INSPECTIONS CREATED BY AUTODIP PENDING AIRCRAFT RECORDS AUDIT & T/A: 15 FC....AZ/U370830 UPDATE. TOMCQC REV PERFORMED PHASE II INSPECTION OF HORIZONTAL STABILIZER AND ELEVATOR PER AMM DMC-B787-A-05-51-19-00A-311A-A NO SIGN OF LIGHTNING STRIKE EVIDENT AT THIS TIME. PHASE 1A AND 1 B LIGHTNING STRIKE INSP ACCOMPLISHED. PHASE II INSPECTION MUST BE COMPLETED WITHIN 50 FLIGHT CYCLES FOR THE FUSELAGE, VERTICAL STABILIZER, AND RUDDER. TOMC APPROVED : QC REVIEWED. RECORDS UPDATE OK TO CARRY THE PHASE 2 INSPECTION FOR THE FUSELAGE, VERTICAL STABILIZER, AND RUDDER WITHIN 50 FLT CYCLES PER AMM 05-51-19. CARRIED DIRECTLY BY TOMC TOMC-APPROVAL FROM SC1ELBYC COMMENT TOMC APPROVED

More about the Boeing 787-9