What was found
FLIGHT DECK LOWER NODE R/H AND L/H I/B HOLES HAVE CRACK INDICATIONS. ACCOMPLISHED INTERIM REPAIR OF THE FRONT WINDSHIELD FRAME AND CONTINUITY FITTINGS PER ECRA 5311-03068 REV- PT1, QC INTERIM REPAIR PERFORMED PER PART 1 OF ECRA 5311-03068. PER PART 1 STEP 3-FOR THE FRONT WINDSHIELD FRAME AND CONTINUITY FITTINGS, PLANNING TO CONTACT ENGINEERING AFTER 63,681 TOTAL AIRCRAFT FLIGHT CYCLES BUT BEFORE 64,681 TOTAL AIRCRAFT FLIGHT CYCLES FOR THE ECRA 5311-03068 PART 2 INSPECTION REQUIREMENTS. (CURRENT PTC 35081) TOMC-APPROVAL FROM SC1ELBYC COMMENT QC REVIEWED. INSPS OF THE FRONT WINDSHIELD FRAMES AND CONTINUITY FITTINGS PER PART 2 OFTHE LATEST REVISION OF ECRA 5311-03068 ON OR BEFORE THE AC REACHES 65681 TOTAL AIRCRAFT FLIGHT CYCLES ACCOMPLISHED INTERIM REPAIR OF THE FRONT WINDSHIELD FRAME AND CONTINUITY FITTINGS PER ECRA 5311-03068 REV-, PT1 QC INTERIM REPAIR PERFORMED PER PART 1 OF ECRA 5311-03068. PER PART 1 STEP 2.