What was found
AT C-CHECK IN BFM, DURING INSPECTION OF FWD FACE OF FR 35 LH SIDE BTWN STRG 30 AND STRG 31 WAS FOUND CRACK. REPAIR ACCOMPLISHED IAW ECRA 5331-02600 ON VTMAE N/R 81943. THE LATEST REVISION OF EC/RA 5331-02600. PLANNING TO CONTACT ENGINEERING AFTER APRIL 14, 2024, BUT BEFORE MAY 14, 2024 FOR PART 3 PERMANENT REPAIR AT FR35 STGR 30LH PER REF ECRA 5331-02600 PART 1A INTERIM RPR, STEP 3. DIP INITIATED TOMC-APPROVAL FROM SC1ELBYC COMMENT TO READ AS FOLLOWS.PLANNING TO CONTACT ENGINEERING AFTER APRIL 14, 2024, BUT BEFORE MAY 14, 2024 FOR PART 3 PERMANENT REPAIR AT FR35 STGR 30LH PER THE LATEST REVISION OF EC/RA 5331-02600. REPAIR HAS BEEN ACCOMPLISHED PER ECRA 5331-02600 REV C WITHOUT QC DEVIATIONS. ORIGINAL DISCREPANY FOUND ON VTMAE NON-ROUTINE 81967 AND LP 4456199.