What was found
PER ECRA 5370-01137 PART 1-INTERIM REPAIR, STEP 3 GENERATE ANOTH ER LOG PAGE REFERENCING THE ONE GENERATED IN STEP 2 (LP 9447987) TO READ AS FOLLOWS: FOR THE REPAIR ON THE FUSELAGE LH & RH AFT DOORWAY LOWER MAIN SILL INNER CHORD BETWEEN STA 948 & STA 986, P LANNING TO CONTACT ENGINEERING AFTER FEB 01, 2026, BUT BEFORE MA R 01, 2026, FOR THE ECRA 5370-01137 PART 3 PERMANENT REQUIREMENT S. FOR THE REPAIR ON THE FUSELAGE LH & RH AFT DOORWAY LOWER MAIN SILL INNER CHORD BETWEEN STA 948 & STA 986, P LANNING TO CONTACT ENGINEERING AFTER FEB 01, 2026, BUT BEFORE MA R 01, 2026, FOR THE ECRA 5370-01137 PART 3 PERMANENT REQUIREMENT S. QC TOMC UPDATE: NOTE TO PLANNING: THIS ECRA IS BEING EVALUATED FOR DAMAGE TOLERANCE UNDER 14 CFR 25.571 AND 14 CFR 26.47 AND WILL RECORDS UPDATE SILL INNER CHORD BETWEEN STA 948 & STA 986, PLANNING TO CONTACT ENGINEERING AFTER FEB 01, 2026, BUT BEFORE MAR 01, 2026, FOR THE ECRA 5370-01137 PART 3 PERMANENT REQUIREMENTS. LIKELY BE MADE PERMANENT WITH REPEAT INSPECTIONS. DIP INITIATED PER ECRA 5370-01137 PART 1 INTERIM REPAIR, STEP 3 FOR THE REPAIR ON THE FUSELAGE LH & RH AFT DOORWAY LOWER MAIN TOMC APPROVED DIP CARRY. REF LP 9447987, FOR THE REPAIR ON THE FUSELAGE LH & RH AFT DOOR WAY LOWER MAIN SILL INNER CHORD BETWEEN STA 948 & STA 986, PLANNING TO CONTACT ENGINEERING AFTER FEB 01, 2026 BUT BEFORE MAR 01, 2026 FOR THE ECRA 5370-01137 PART 3 PERMANENT REQUIREMENTS.