Service difficulty report · Control Panel · Boeing 7378

Difficulty date
November 8, 2024
Submitted
November 11, 2024
Operation
Air carrier
Aircraft
N7299
Make and model
Boeing 7378
Aircraft serial
67555
Aircraft time
6,038 hours, 2,138 cycles
Part
Control Panel
Part number
510903841040
Part serial
07217
Condition
Faulty
Location
E/E Bay
Part time
6,038 hours, 2,138 cycles
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
B, A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ENG 1 FWD-ENG 2 AFT CENTER LEFT LOW PRESS C/B'S POPPED ON P91 PNL...115V AC BUS1 SEC2. IS IN HGR TECH SUPPORT OFFICE CREW DEBRIEF. DURING CLIMB ALT IN TEENS MSTR CAUTION AND FUEL CONTINUED, CHKD P91 F5 XFER BUS 1 SEC2 C/B WAS NOT POPPED. WHILE CHECKING VOLTAGE AT C827, C828, & C845, FOUND "C" PHASE AT REF. WDM 24-51-11-1 SUGGEST CHECK C3002 CB FOR 115VAC AT A2,B2, NOTE: C2 PHASE ALSO POWERS RT SIDE WINDOW HEAT. AT CONNECTOR D11414J FOUND 16.95 VAC AT PIN C & ANNUNCIATED WITH ASSOC. LT FWD, RT AFT & LT CTR B/P LOW PRESS GFI'S NOT TRIPPED. NOTICED BPCU FAULT LIGHT ON. NEEDS FURTHER "0" VOLTS, "A" & "B" PHASE HAD 115 VAC. C2. 24-51-14-1. 115 VAC AT PINS A & B. REMOVED P91 PANEL REF AMM LIGHTS. NO OTHER ABNORMALITIES NOTED. REF SSM 28-23-11-101, T/S. IF NEEDED P/N 762187G, 42-2441-9-0003 NIS LAX. BITE OF ELEC 24-21-21-000-801, FOUND XFR BUS 1 SEC 2 C.B. C3002 INTERNALLY 24-51-11-101. FOUND D1 D3 D5 BOOST PUMPS 1FWD, 2AFT AND CTR LT PNL ON OVERHEAD, NO FAULTS RECORDED. BAD. NEW P91 PANEL M& E REMOVED P91 PNL IDT FOR P91 PANEL FEED CABLE INSTALLATION VERIFIED , R/R P91 POWER DISTRIBUTION PANEL REF AMM 24-21-21/401. REQUIRES PERFORMED OPS CHECK OF ALL FUEL PUMPS. LOW PRESS LIGHT OPS CHK.