What was found
AD RELATED TASK (AD 2022-08-08). TWO CRACK INDICATIONS HOLE #A A T 9 AND 3 HRS O''CLOCK POSITION IN FRAME LAYER WITH 100% FSH (BOT H) AT RH FRAME 16 UPPER DOUBLE JOGGLE AREA "REPAIR BEFORE NEXT F LIGHT". TO ACCOMPLISH INITIAL INSP OF RH FR16 UPPER DOUBLE JOGGLE HOLES REACHES 41070 TFC. PERFORM REPEAT INSP AT INTERVALS NOT TO A&B PER PART 2 OF THE LATEST REV ECRA 5311-03335 ON OR BEFORE AC EXCEED 5400 FC THEREAFTER. PERFORMED PART 1 INTERIM REPAIR OF RH FR16 UPPER DOUBLE JOGGLE HOLES A&B IAW ECRA 5311-03335. DIP.