What was found
EXTERNAL POWER SERVICE DOOR SKIN HAS CRACK ACCOMPLISHED STEPS 1 THRU 6 OF REPAIR 4 WILL REQUIRE HFEC OF THE TRIM OUT EDGE FOR STEP 7 REF. SRM 53-10-15-2R-4 INSPECTION UPDATE: COMPLETED HFEC OF EGPR SURROUND DOUBLER ON LWR FLANGE FOR REPAIR 4, ALTERNATE #2, ZONE 2, FIG 204, SHEET 3 AND 4. HFEC COMPLETED IAW 737 NDT PT 6, 51-00-00 PROC 23 NO DEFECTS NOTED. FABRICATED DOUBLER AND FILLER, PRIMED AND INSTALLED PER SRM 53-10-15-2R-4. OPS CHECKED DOOR GOOD. COMPLETED RII REQUIREMENTS FOR FINAL INSTALLATION OF REPAIR TO EXTERNAL POWER PANEL CUTOUT STRUCTURE IAW GMM 9-25-05 PER PREVIOUS LOG SHOULD ALSO STATE REF FIGURE 204 SHEET 3-4. RII REQUIREMENTS HAVE BEEN COMPLIED WITH IAW GMM 9-25-05