What was found
EMER LIGHTING SEAT 11C CAME LOOSE. PERFORMED PART 1, INTERIM REPAIR PER ECRA 2520-07888. PERFORM PART 2 INSPECTION REQUIREMENTS EVERY FLIGHT CYCLE AND PERFORM PART 3 PERMANENT REPAIR WITHIN 5 FLIGHT CYCLES. TOMC APPROVED. DIP ISSUED IAW ECRA 2520-07888 INSPECT SECURITY OF TAPE APPLIED PER PART 1 (RE-APPLY AS REQUIRE PER PART 1 STEPS 1-3) EVERY FLIGHT CYCLE AND PERFORM A PERMANENT REPAIR WITHIN 5 FLIGHT CYCLES.