What was found
REF EA 5310-08195 REV B OP 004 STEP 26 - CRACK FOUND ON 3RD LOWER FASTENER HOLE AT RT WINDOW FRAME #3 AFTER REAM UP TO PRE COLD WORK DIMENSION (0.300"). ACCOMPLISHED CATEGORY B REPAIR AT RH SIDE NR 3 WINDOW FRAME E-F POST AS PER EC/RA 5310-08554 PART 1. PERFORM REPETITIVE INSPECTION REQUIREMENTS (RIR) AS STATED IN PART 2, AND THERE IS NO TERMINATING ACTION FOR THESE REPETITIVE INSPECTION REQUIREMENTS AS STATED ON PART 3 OF AFOREMENTIONED EC/RA. INITIATE NEW DIP LOG PAGES TO READ SAME AS EC/RA PART 1 PARAGRAPH 2 AND PART 1 PARGRAPH 3.