Service difficulty report · Relay · Boeing 757324

Difficulty date
August 9, 2025
Submitted
August 11, 2025
Operation
Air carrier
Aircraft
N74856
Make and model
Boeing 757324
Aircraft serial
32815
Aircraft time
62,233 hours, 20,164 cycles
Part
Relay
Part number
MS274182A
Condition
Failed
Location
Zone 100
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT CENTER FUEL PUMP PRESSURE LIGHT ON DURING CRUISE WITH 2000 LBS IN CTR TANK. CENTER FUEL PUMP L HAS HISTORY, REQUESTING MEL 2822G. C/B SECURED & LIGHT LENS COVER INSTALLED. WHEN CLEARING DEFERRED ITEM, REMOVE COVER AND RETURN TO SPARE BULB CONTAINER OR REMOVE TAPE. APPROVED C/W MEL 2822G PLACARD APPLIED. CHECKED VOLTAGES OF 3 PHASE CONNECTOR D1766. GOT 115VAC INITIALLY AND VOLTAGE SUDDENLY DROPPED TO ZERO VAC AFTER 2 SEC. R & R GFI RELAY K10011, & LT CTR PUMP STARTED WORKING. ACCPD INSTALLATION UP TO STEP E.6, PUMP REVERSAL OP TEST. TEST PASSED. COMPLIED WITH DDP REF AMM 28-22-00-715-768 AND WDM 28-22-11-905, RELAY THAT WAS R & R IS NOT A GFI RELAY AND IS AFTER THE UFI SYS, CONCURRED THAT INSPECTION FLAG NOT REQUIRED. LT CENTER OVERRIDE PUMP OPS NORMALLY IAW AMM 28-22-15 MEL REMOVED.