What was found
RIGHT ENGINE EXCEEDED EGT 964. R & R NR 2 ENG LEFT UPPER EGT PROBE (T49.5S4) IAW AMM 77-21-04-401. PROBE TESTS OK, R & R LT LOWER NR 3 EGT PROBE ON NR 2 ENG IAW AMM 77-21-04-401 PROBE OPS CHECKS GOOD. R & R T495S4 AND CLEANED ALL T495 SENSRS, J9, J10, CJ9 & CJ10 ELEC CONNECTORS IAW AMM 77-21-04-401 RAN ENGS FOR 5 MINS. S1 & S4 WITHIN 25 DEGREE IAW FIM 77-21 TASK 804 S2 & S3 64 DEGREE C SPLIT. R & R T495S3 REF AMM 77-21-04-401 RAN ENGS FOR 5 MINS, NO HELP STILL 65-70 DEGREE SPLIT BETWEEN S2-S3. R & R CJ10 HARNSS IAW AMM 73-21-06-400-803, RAN ENGS FOR 5 MINS. NO HELP, T495S2 & T495S3 STILL SHOW ABOUT A 70 DEGREE SPLIT. R & R ENG 2 J10 HARNESS IAW AMM 73-21-06. OPS CHECK REMAINS REQUIRED.