What was found
SUPPORT TASK L1 DOOR, HANDLE BOX CUTOUT, UPPER TORQUE TUBE BEARING AREA, STUB BEAM IS GOUGED, REMOVED DAMAGED STUB BEAM AND INSTALLED NEW STUB BEAM REF SRM 51-40-02, NAC DWG 141A6260 AND 141A6143.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SUPPORT TASK L1 DOOR, HANDLE BOX CUTOUT, UPPER TORQUE TUBE BEARING AREA, STUB BEAM IS GOUGED, REMOVED DAMAGED STUB BEAM AND INSTALLED NEW STUB BEAM REF SRM 51-40-02, NAC DWG 141A6260 AND 141A6143.