What was found
LH VAPOR BARRIER WEB FOUND CRACKED REQUIERES FABRICATION. FABRICATED, LOCATED, AND DRILLED NEW DOUBLER APPLIED ALODINE AND PRIMER IAW SRM 51-40-05-0G-0, DWG 111A1511 REV: B, DWG: 111A1001 REV -, AMM 51-21-41-370-802 51-21-72-370-804.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LH VAPOR BARRIER WEB FOUND CRACKED REQUIERES FABRICATION. FABRICATED, LOCATED, AND DRILLED NEW DOUBLER APPLIED ALODINE AND PRIMER IAW SRM 51-40-05-0G-0, DWG 111A1511 REV: B, DWG: 111A1001 REV -, AMM 51-21-41-370-802 51-21-72-370-804.