What was found
DUE TO THE AMOUNT OF STANDING WATER AND ICE, INSPECTION OF THE FORWARD BILGE ARE IS NEEDED PER TRM ECRA 2011-01000. PARTICULARY BETWEEN BS 600 & 900. WITH WATER LEAK ORIGINATING BEHIND RT CARGO WALL LINER AT BS 800. SUPPLIED HOT CONDITIONED AIR WITH APU TO THE CABIN AND FORWARD CARGO IAW AMM 12-33-03 TO HELP THAW ICE BUILDUP AID IN THE PROCESS OF CLEAN UP. SPILL CLEANED AND AREA INSPECTED . ALL DEFECTIVE SOUND PROOFING MATERIAL REPLACED AS REQUIRED. FOLLOW UP INSPECTION WILL BE DONE BEFORE 36 MONTHS.. INSPECTION WAS DONE IN REFERENCE WITH ECRA 2011-0100.