As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING INSPECTION ON NR 2 ENGINE, FOUND IDG FEEDER CABLE HAS BARE WIRE EXPOSED. FEEDER CABLE RE-SLEEVED AND INSTALLED IAW AMM24-11-01-404-001-006 AND SWPM 20-30-08 . CARRIED OUT OPERATIONAL TEST FOR NR 2 ENGINE IDG WRT AMM 24-11-00-715-006. ALL INDICATIONS AND PARAMETERS NORMAL AT THIS TIME. ACCOMPLISHED RIGHT IDG DISCONNECT FUNCTION WRT AMM 24-11-01-726-001, RING PULL CARRIED OUT AND IDG CONNECTED, ENGINE GROUND RUN ACCOMPLISHED WITH ALL NORMAL INDICATIONS AT THIS TIME.