What was found
FLIGHT DECK, WINDSHIELD CTR POST, LOWER NODE, INBD HOLE BOTH LT & RT SIDE HAS CRACK INDICATION AT LOWER SURFACE. LT SIDE: 40% S.H. 6 OCLOCK POS. AT .050 LONG. RT SIDE: 80% S.H. 6 OCLOCK POS. AT 100 LONG. ACCOMPLISHED INTERIM REPAIR AT LT & RT WINDSHIELD FRAME CENTER POST LWR NODES, THE LT & RT MOST INBD FASTENER HOLE D IAW ECRA 5311 -03436 PART 1.1. ACCOMPLISH INITIAL INSP OF THE LT & RT WINDSHIEILD FRAME CENTER POST LWR NODE HOLE D IAW PART 2 OF THE LATEST REV OF ECRA 5311-03436 ON OR BEFORE 38,000 TOTAL ACFT FC. PERFORM REPEAT INSP AT INTERVALS NOT TO EXCEED 5,300 FC THEREAFTER. IAW ECRA 5311-03436-PART 1.2.