What was found
IN FLIGHT ECAMG SYS LO PRESSUREG RSVR LO LVLG ENG1 PUMP LO PR LOCKING LOG CAPT STATED THEY FOLOWED PROCEDURES AFTER ECAM WARNING. PUMP RAN APROX 2MIN AFTER ECAM WARNING FOR G HYD LOW PRESS AS THEY FOLLOWED CHECKLIST. HYD FLUID COMING FROM ENG 1 PYLON. ZONE C DRAIN ON THE E1 PYLON, WILL NEED FLUID PUMPED IN AND HEAD PRESSURE WITH SOME GREEN SYS PRESSURE TO VALIDATE. ZONE C DRAIN ON THE E1 PYLON, WILL NEED FLUID PUMPED IN AND HEAD PRESSURE WITH SOME GREEN SYS PRESSURE TO VALIDATE. FOUND HYDRAULIC SUPPLY LINE BLOWN OUT. REMOVED #1 ENG PRESSURE PIPE FOR GREEN SYSTEM REF AMM 29-11-49-000-013-A. ADD EMP:U386240 INSTALLED AND SECURED NEW PRESSURE PIPE IN REF AMM 29-11-49-400-013-A UP TO STEP D. PRESSURE LINE ONLY. COMPLETED INSTALLATION OF ENG 1 HYD PRESSURE LINE PER AMM 29-11-49-400-013-A. OPS CHECK GOOD. NO LEAKS OR DEFECTS NOTED AT THIS TIME.