Service difficulty report · Control Valve · Boeing 737824

Difficulty date
August 3, 2026
Submitted
August 7, 2026
Operation
Air carrier
Aircraft
N86534
Make and model
Boeing 737824
Aircraft serial
62750
Aircraft time
31,060 hours, 11,802 cycles
Engine
Cfmint CFM567B27
Part
Control Valve
Condition
Faulted
Location
Rt Acm
Part time
77,604 hours, 27,458 cycles
Stage of operation
NR
How discovered
O
Nature of condition
B, J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RIGHT PACK LIGHT ILLUMINATED. AFTER ENG SHUTDOWN AT GATE. OPENED ECS RT PACK BAY, BURNED OIL ODOR PRESENT. TROUBLESHOT DOWN TO RT PACK, WITH PACK OFF, NO ODOR PRESENT. MEL 2101B APPLIED FOR RT PACK INOP. FIM 21-00 TASK 801 FOR RT PACK WARNING LIGHT ON, AFTER REVERSING MEL. PACK FLOW SENSOR MESSAGE 21-51239 AFTER BITE TEST. NEED TO REPLACED RT PACK FLOW SENSOR IAW FIM 21-53 TASK 821. DEACTIVATED RT PACK AFTER TEST. COMPLIED WITH MEL 2101B. COMPLY WITH FIM 21-00 TASK 801, DUE TO ODOR PRESENT. REPLACED RT PACK FLOW SENSOR. RAN INTIAL GROUND TEST, TEST PASSED. RAN RT PACK. PACK RAN FOR 3 MINS BEFORE KICKING OUT. RESET A/C SYS & RAN TEST AGAIN. S YSTEM FAULTED AGAIN. PERFORMED GROUND TEST, THIS TIME TEST FAILED & 2 FAULTS WERE PRESENT. FAULTS INDICATED FAULTY ZONE TEMP CONTROL VALVE. VALVE HAS HISTORY OF BEING CHANGED BACK ON 7/30. REPLACED THE RT PACK FLOW SENSOR. . RAN INTIAL GROUND TEST, TEST PASSED.