What was found
LEFT FR16 HOLE NO.2,NO.4,NO.6 HAVE A CRACK IN FRAME LAYER AT 11 O'CLOCK POSITION AND HOLE NR 19 HAS AN OUT OF ROUN D CONDITION IN FRAME LAYER. FR 16 HOLE 19 ACCOMPLISHED ON LP 9642983, FR 16 HOLE 2 ACCOMPLISHED ON LP 9643006, AND FR 16 HOLE 4 ACCOMPLISHED ON LP 9643045. THIS LOG PAGE WILL CAPTURE THE REPAIR & DIP FOR FR 16 HOLE 6. REPAIRED LT FRAME 16 HOLE 6 IAW A319 SRM 53-11-12-300-012. CRACK FOUND DURING ISBS ACCOMPLISHMENT REF FIG 1 SHT 1 STEP 2. HOLE 6 DAMAGE FOUND IN FRAME LAYER (CONCERNED LAYER) REF FIG 1 SHT 1 S TEPS 3-4. HOLE 6 FOUND AT NOMINAL DIAMETER .3110 REF FIG 1 SHT 1 STEP 5. CRACK FOUND ON HOLE 6 REF FIG 1 SHT 1 STEP 7. FIRST OVE RSIZED HOLE TO DIAMETER OF .3270, ROTO PROBE PERFORMED, DAMAGE S TILL REMAINS, SECOND OVERSIZED HOLE TO A DIAMETER OF .3420. ROTO PROBE PERFORMED, DAMAGE STILL REMAINS, BUSHING REPAIR REQUI RED REF FIG1 SHT1 STEP 9 & FIG1 SHT 2 STEPS 12-16, 19 & 20. REF FIG 5 FOR BUSH REPRINT.