What was found
A MAINTENANCE LIFT TRUCK STRUCK THE FUSELAGE CREATING A HOLE THROUGH SKIN AT STA 140.038, 3 INCHES BELOW LONGERON 20R. THE HOLE WAS APPROXIMATELY .875 L BY .5 W. THE AREA WAS REPAIRED IAW SRM 53-04 FIGURE 12B PAGE 608A SHEET 15.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
A MAINTENANCE LIFT TRUCK STRUCK THE FUSELAGE CREATING A HOLE THROUGH SKIN AT STA 140.038, 3 INCHES BELOW LONGERON 20R. THE HOLE WAS APPROXIMATELY .875 L BY .5 W. THE AREA WAS REPAIRED IAW SRM 53-04 FIGURE 12B PAGE 608A SHEET 15.