What was found
THE JETWAY STRUCK AIRCRAFT AND DAMAGED SKIN AT FORWARD ENTRY DOOR HOLD OPEN AREA STA 119-120. A CLASS III DOUBLER REPAIR WAS INSTALLED IAW SRM 53-04, FIGURE 12B. A DIP WAS ISSUED TO REPLACE THE REPAIR WITH A PERMANENT REPAIR WITHIN 8,000 CYCLES AND TO REINSPECT THE AREA WITHIN 3,000 CYCLES.