What was found
INSPECTION FOUND AFT LAV SERVICE CENTER PAN STRUCTURE CORRODED AT STA 1006. CHANNELS WERE FABRICATED IAW BOEING DRAWING 69-36677 AND A NEW LAV PAN STRUCTURE WAS FABRICATED IAW SRM 51-30-5. INSTALLATION WAS PERFORMED IAW SRM 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION FOUND AFT LAV SERVICE CENTER PAN STRUCTURE CORRODED AT STA 1006. CHANNELS WERE FABRICATED IAW BOEING DRAWING 69-36677 AND A NEW LAV PAN STRUCTURE WAS FABRICATED IAW SRM 51-30-5. INSTALLATION WAS PERFORMED IAW SRM 51-30-2.