What was found
INSPECTION FOUND CORROSION ON UPPER CAP OF FLOORBEAM IN C-2 CARGO COMPARTMENT AT STA 1701, RBL 37. THE CORROSION WAS REMOVED IAW SRM 51-21-01. DOUBLERS AND FILLER ANGLE WERE FABRICATED AND INSTALLED IAW SRM 53-60-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION FOUND CORROSION ON UPPER CAP OF FLOORBEAM IN C-2 CARGO COMPARTMENT AT STA 1701, RBL 37. THE CORROSION WAS REMOVED IAW SRM 51-21-01. DOUBLERS AND FILLER ANGLE WERE FABRICATED AND INSTALLED IAW SRM 53-60-01.