What was found
INSPECTION FOUND FLOOR TRACK CORRODED AT STA 380 TO 420, RBL 25. THE TRACK WAS REMOVED AND A NEW TRACK WAS FABRICATED AND INSTALLED IAW SRM 53-05-01 AND 51-10-01.