What was found
NUMBER ONE ENGINE O/B COWLING NUMBER SIX RIB CHAFED AT DOUBLER REPAIR. REMOVED DOUBLER AND FILLER MATERIAL. FABRICATED, TREATED, PRIMED, AND INSTALLED NEW DOUBLER PER SRM 51-40-3, 51-10-2, AND MM 51-20-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NUMBER ONE ENGINE O/B COWLING NUMBER SIX RIB CHAFED AT DOUBLER REPAIR. REMOVED DOUBLER AND FILLER MATERIAL. FABRICATED, TREATED, PRIMED, AND INSTALLED NEW DOUBLER PER SRM 51-40-3, 51-10-2, AND MM 51-20-11.