Service difficulty report · Coupling · Emb EMB145LR

Difficulty date
December 30, 2009
Submitted
January 4, 2010
Operation
Air carrier
Aircraft
N261SK
Make and model
Emb EMB145LR
Aircraft serial
145144
Aircraft time
25,993 hours, 20,562 cycles
Engine
Allsn AE3007A
Engine time
25,016 hours, 18,260 cycles
Part
Coupling
Part number
8151138
Condition
Cracked
Location
Ac Bay
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING INITIAL CLIMB OUT OF MSY THE CREW REPORTED A BLEED 1 LEAK MESSAGE ON EICAS. THE QRH WAS FOLLOWED AND THE MESSAGE CLEARED. DUE TO ICING CONDITIONS IN THE AREA AND WEATHER CLOSING IN ON THE AREA, IT WAS DECIDED TO RETURN TO MSY WHERE THE AIRCRAFT LANDED WITHOUT INCIDENT. MAINTENANCE FOUND THE RUBBER COUPLING FROM THE ACM TO THE DUAL TEMP CONTROL VALVE CRACKED ON THE NR 2 PACK AND THE PACK WAS DEFERRED. THE DEFERRAL WAS CLEARED IN CLE WHEN THE COUPLING WAS REPLACED AND NO FURTHER DEFECTS WERE NOTED.

More about the Emb EMB-145LR