Service difficulty report · Relay · Emb EMB145LR

Difficulty date
August 6, 2011
Submitted
August 8, 2011
Operation
Air carrier
Aircraft
N562RP
Make and model
Emb EMB145LR
Aircraft serial
145451
Aircraft time
22,818 hours, 18,286 cycles
Engine
Allsn AE3007A
Engine time
23,548 hours, 16,799 cycles
Part
Relay
Condition
Failed
Location
Ac Bay
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CREW REPORTED THAT DURING FLIGHT RECEIVED A COOLING PACK 2 VALVE CLOSED MESSAGE. COOLING PACK 1 WAS DEFERRED THE PREVIOUS DAY. AS A RESULT THE AIRCRAFT LOST PRESSURIZATION. THE CREW ALSO REPORTED, RECEIVED WING ANTI-ICE 1 AND WING ANTI-ICE 2 VALVE FAIL MESSAGES. RETURNED TO KMEM AND LANDED WITHOUT INCIDENT. MAINTENANCE LOCKED BOTH ANTI-ICE VALVES OPEN AND DEFERRED THE WING ANTI-ICE SYSTEM. PERFORMED OPERATIONAL CHECKS OF THE PRESSURIZATION SYSTEM AND OPERATIONAL CHECKS WERE GOOD. KSDF MAINTENANCE CLEARED THE DEFERRAL FOR THE WING 1 AND 2 ANTI-ICE SYSTEMS LATER THAT DAY. REPLACED RELAY K0528, OPERATIONAL CHECKS OF THE WING 1 AND 2 ANTI-ICING SYSTEMS WERE GOOD WITH NO FURTHER DEFECTS NOTED.

More about the Emb EMB-145LR