As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING C-CHECK, A DENT ON THE CARGO DOOR WAS REPAIRED. THE DENT WAS PREVIOUSLY DEFERRED (DMI 58470) TO BE REPAIRED WITHIN 2500 HOURS. THE CARGO DOOR WAS REPAIRED IN ACCORDANCE WITH ETD 2011-145/04740 REVISION A. THIS ACTION CLEARED THE DEFERRAL. INSPECTIONS OF THE CARGO DOOR WILL BE CARRIED OUT AT AN INTERVAL OF 9056 FLIGHT CYCLES IN ACCORDANCE WITH SRM 52-30-01.