What was found
DURING INSPECTION THE LEFT AND RIGHT FRAME 10 WERE FOUND TO BE CRACKED. MAINTENANCE REPLACED THE LEFT AND RIGHT FRAME 10. THE NEW PARTS WERE INSTALLED WITH A SOLD RIVET IN ACCORDANCE WITH SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION THE LEFT AND RIGHT FRAME 10 WERE FOUND TO BE CRACKED. MAINTENANCE REPLACED THE LEFT AND RIGHT FRAME 10. THE NEW PARTS WERE INSTALLED WITH A SOLD RIVET IN ACCORDANCE WITH SRM 51-40-02.