What was found
DURING INSPECTION, CORROSION WAS FOUND UNDER THE CARBON FLOOR CROSS BEAM ON THE LEFT OF FRAME 18. THE CARBON FLOOR CROSS BEAM LEFT SIDE WAS REPAIRED IN ACCORDANCE WITH SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION, CORROSION WAS FOUND UNDER THE CARBON FLOOR CROSS BEAM ON THE LEFT OF FRAME 18. THE CARBON FLOOR CROSS BEAM LEFT SIDE WAS REPAIRED IN ACCORDANCE WITH SRM 51-40-02.