What was found
DURING INSPECTION, CORROSION WAS FOUND ON THE RIGHT OMEGA BEAM SURFACE AT THE FORWARD NUT PLATE HOLE FOR THE GUSSET AT FRAME 20. THE RIGHT OMEGA BEAM AT FRAME 20 WAS REPAIRED IN ACCORDANCE WITH SRM 53-21-10 AND 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION, CORROSION WAS FOUND ON THE RIGHT OMEGA BEAM SURFACE AT THE FORWARD NUT PLATE HOLE FOR THE GUSSET AT FRAME 20. THE RIGHT OMEGA BEAM AT FRAME 20 WAS REPAIRED IN ACCORDANCE WITH SRM 53-21-10 AND 51-40-02.