What was found
TOP SURFACE OF FLOORBEAM UPPER CAP AT STA 1720, WL 200, BL 0 TO LBL 108 HAS SEVERAL AREAS 1 INCH DIAMETER WITH EXFOLIATED LEVEL 2 CORROSION. REPAIRED IAW DWG 65B38134-6 ITEMS 2 AND 3. FOUND DURING ACCOMPLISHMENT OF CARGO CONVERSION, ROUTINE C-CHECK, AND ACCOMPLISHMENT OF CPCP TASK CARDS AT BOEING WICHITA (KIAB). WORK ORDER NUMBER MO280, TASK CARD NR C53-210-01, CPCP TASK CARD NR C53-210-01-03.