What was found
DURING ACCOMPLISHMENT OF C-CHECK, FOUND RT WING NR 2 FLAP VANE LEADING EDGE IS GROOVED 20 I/B FROM VANE O/B END. CUT OUT DAMAGED AREA AS REQUIRED PER SRM 51-53-00 FIG 812. FABRICATED REPAIR DOUBLERS, TRIMMED, DEBUR AND REPROTECTED IAW SRM 51-21-00. INSTALLED REPAIR DOUBLER IN POSITION AS PER SRM 51-40-01. REPAIR CARRIED OUT IAW SRM 57-53-00 FIG 812. FOUND DURING ACCOMPLISHMENT OF SCHEDULED C-CHECK AT GAMCO, INC. WORK CARD 57686, RO 107-307, NON-ROUTINE WORK CARD NR 2084.