What was found
BS 2007, LBL16 CORROSION ON THE TEE CHORD FLOOR STRUCTURE. CORRODED SECTION OF CHORD WAS TRIMMED OUT. NEW SECTION FABRICATED FROM THE TEE PN NJC6040-175 WAS INSTALLED WITH SPLICES PN N621AX-NRC387-1/-2 IAW SRM VOL I 53-40-00, FIG 16 AND USING FASTENERS IAW SRM VOL II, 51-33-01, PAGE 34, BACB30MYGKGX.