What was found
HEAVY CK / COE / MAJOR REPAIR: LT O/B LONGITUDINAL FLOORBEAM JUST FWD OF FLOORBEAM 23 IS CRACKED. REMOVED LT O/B LONGITUDINAL FLOORBEAM FROM FRAME 22-23. FABRICATED AND INSTALLED FLOORBEAM PER EO 5315-01 REV D.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HEAVY CK / COE / MAJOR REPAIR: LT O/B LONGITUDINAL FLOORBEAM JUST FWD OF FLOORBEAM 23 IS CRACKED. REMOVED LT O/B LONGITUDINAL FLOORBEAM FROM FRAME 22-23. FABRICATED AND INSTALLED FLOORBEAM PER EO 5315-01 REV D.