What was found
HEAVY CK COE / MAJOR REPAIR. ACCESS FWD SIDE OF AFT PRESSURE BULKHEAD TO REPAIR SPLICE TO FRAME 44. REPAIR FRAME 44-21 INCHES TO THE RIGHT AND TO THE LEFT OF BL 0 PER STRUCTURAL REPAIR INSTRUCTIONS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HEAVY CK COE / MAJOR REPAIR. ACCESS FWD SIDE OF AFT PRESSURE BULKHEAD TO REPAIR SPLICE TO FRAME 44. REPAIR FRAME 44-21 INCHES TO THE RIGHT AND TO THE LEFT OF BL 0 PER STRUCTURAL REPAIR INSTRUCTIONS.