What was found
HEAVY CK / MAJOR REPAIR / LEVEL 2 CORROSION, FWD SIDE OF FWD PRESSURE BULKHEAD, RT OUTBOARD MOST MID LOWER BONDING POINT FOR RADOME HAS LEVEL 2 CORROSION (LENGTH 1", WIDTH 1", DEPTH .01"). SUBMITTED TO ATR FOR STRUCTURAL REPAIR INSTRUCTIONS.