What was found
NR 1 HEAVY CHECK / MAJOR REPAIR: WHILE WORKING HARDPOINT MOD, MISDRILLED SHEAR TIE AT NET NR 2 LOCATION. FABRICATED AND INSTALL NEW SHEAR TIE FROM TOP OF FRAME 20 STA 9020, BL 0, NEAR WATERLINE 4300 INTERNAL FUSELAGE CENTER TOP.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 1 HEAVY CHECK / MAJOR REPAIR: WHILE WORKING HARDPOINT MOD, MISDRILLED SHEAR TIE AT NET NR 2 LOCATION. FABRICATED AND INSTALL NEW SHEAR TIE FROM TOP OF FRAME 20 STA 9020, BL 0, NEAR WATERLINE 4300 INTERNAL FUSELAGE CENTER TOP.