What was found
DURING HEAVY CHECK, LT LONGITUDINAL FLOOR SUPPORT IS CRACKED AFT OF FRAME 29. FABRICATE AND REPLACE FLOOR SUPPORT IAW EO 5315-01, REV. D.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK, LT LONGITUDINAL FLOOR SUPPORT IS CRACKED AFT OF FRAME 29. FABRICATE AND REPLACE FLOOR SUPPORT IAW EO 5315-01, REV. D.