What was found
HEAVY CHECK COE/MAJOR REPAIR: FWD PRESSURE BULKHEAD, LT UPPER RADOME BONDING POINT HAS LEVEL 2 FRETTING. DOUBLER REPAIR SRM 531110-300-803-A01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
HEAVY CHECK COE/MAJOR REPAIR: FWD PRESSURE BULKHEAD, LT UPPER RADOME BONDING POINT HAS LEVEL 2 FRETTING. DOUBLER REPAIR SRM 531110-300-803-A01.