What was found
DURING 2C CHECK TASK 122-01Z, THE FUSELAGE RT FLOOR PROP AT FRAME 13 WAS FOUND CRACKED. THE PART WAS REPAIRED IN ACCORDANCE WITH EMB-120 SRM STANDARD PRACTICES AND AERODESIGN REPORT NR 3647-1, REV IR, 5-3-00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C CHECK TASK 122-01Z, THE FUSELAGE RT FLOOR PROP AT FRAME 13 WAS FOUND CRACKED. THE PART WAS REPAIRED IN ACCORDANCE WITH EMB-120 SRM STANDARD PRACTICES AND AERODESIGN REPORT NR 3647-1, REV IR, 5-3-00.