What was found
DURING 2C CHECK TASK 131-01Z, THE FUSELAGE LT FLOORBEAM T-SECTION AT FRAME 16 WAS FOUND CORRODED. THE PART WAS REPLACED IN ACCORDANCE WITH EMB-120 SRM STANDARD PRACTICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C CHECK TASK 131-01Z, THE FUSELAGE LT FLOORBEAM T-SECTION AT FRAME 16 WAS FOUND CORRODED. THE PART WAS REPLACED IN ACCORDANCE WITH EMB-120 SRM STANDARD PRACTICES.