What was found
DURING HMV NR 6 INSPECTION, NDT INSPECTION FOUND A CRACK ON THE 540 DB FUEL TANK CUTOUT, BETWEEN WS 85.5 AND 106.4. DAMAGE WAS BLENDED OUT PER REO 601R-57-21-030.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HMV NR 6 INSPECTION, NDT INSPECTION FOUND A CRACK ON THE 540 DB FUEL TANK CUTOUT, BETWEEN WS 85.5 AND 106.4. DAMAGE WAS BLENDED OUT PER REO 601R-57-21-030.