What was found
THE GROUND FEATHER TEST REQUIRED 11 SECONDS FOR PROP TO TRANSITION FROM FEATHER TO BETA RANGE. REPLACED THE LT PROPELLER TRANSFER TUBE OIL SEALS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THE GROUND FEATHER TEST REQUIRED 11 SECONDS FOR PROP TO TRANSITION FROM FEATHER TO BETA RANGE. REPLACED THE LT PROPELLER TRANSFER TUBE OIL SEALS.