What was found
DURING 2C INSPECTION, TASK5320-141-03I REVEALED LT CENTER CROSSBEAM AT FRAME 23 TO BE HEAVILY CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB 120 SRM STANDARD PRACTICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C INSPECTION, TASK5320-141-03I REVEALED LT CENTER CROSSBEAM AT FRAME 23 TO BE HEAVILY CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB 120 SRM STANDARD PRACTICES.