What was found
DURING 2C INSPECTION, TASK 5310-131-01I REVEALED LT CROSSBEAM AT FRAME 14 TO BE CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB 120 SRM STANDARD PRACTICES.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 2C INSPECTION, TASK 5310-131-01I REVEALED LT CROSSBEAM AT FRAME 14 TO BE CORRODED. REMOVED CROSSBEAM AND INSTALLED SERVICEABLE CROSSBEAM USING EMB 120 SRM STANDARD PRACTICES.