What was found
DURING M-CHECK, FOUND NR 2 AFT PYLON ENGINE MOUNT INBD AFT SIDE GOUGED ADJACENT TO BOLT LOCK WIRE HOLE. REPAIRED SECTION I LIMITED TO SIX MONTHS. SECTION II CALLS FINAL REPAIR APPROVAL WITHIN 6 MONTHS OR 182 DAYS FROM 12 AUG 2010.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING M-CHECK, FOUND NR 2 AFT PYLON ENGINE MOUNT INBD AFT SIDE GOUGED ADJACENT TO BOLT LOCK WIRE HOLE. REPAIRED SECTION I LIMITED TO SIX MONTHS. SECTION II CALLS FINAL REPAIR APPROVAL WITHIN 6 MONTHS OR 182 DAYS FROM 12 AUG 2010.